Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
agendaplanning2017-11-20 [2017/11/14 10:44]
bolland
agendaplanning2017-11-20 [2018/08/28 17:45] (current)
Line 27: Line 27:
     - 17/00901/FUL | Erection of extension to south elevation of existing factory (part retrospective application) | Sylatech Ltd Ings Lane Kirkbymoorside North Yorkshire YO62 6PX ** Approved **     - 17/00901/FUL | Erection of extension to south elevation of existing factory (part retrospective application) | Sylatech Ltd Ings Lane Kirkbymoorside North Yorkshire YO62 6PX ** Approved **
     - 17/00966/FUL | Change of use and alterations to Barns 1 and 2 to include erection of two storey extension with single storey linking extension to form a 4no. bedroom dwelling with attached 1no. bedroom studio to include parking and amenity areas, decking and demolition of existing fold yard roof (revised details to refusal 16/00820/FUL dated 15.08.2016) | Bowforth Farm Back Lane Welburn Kirkbymoorside YO62 6HJ  ** Refused **     - 17/00966/FUL | Change of use and alterations to Barns 1 and 2 to include erection of two storey extension with single storey linking extension to form a 4no. bedroom dwelling with attached 1no. bedroom studio to include parking and amenity areas, decking and demolition of existing fold yard roof (revised details to refusal 16/00820/FUL dated 15.08.2016) | Bowforth Farm Back Lane Welburn Kirkbymoorside YO62 6HJ  ** Refused **
- 
   - To note the date of the next meeting will be 18 December 2017 if there are Planning applications for consideration   - To note the date of the next meeting will be 18 December 2017 if there are Planning applications for consideration
      
agendaplanning2017-11-20.1510656270.txt.gz · Last modified: 2018/08/28 17:40 (external edit)
CC Attribution-Noncommercial 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0